The contract covered: 24 V80/2.0 MW wind turbines with a total height of 120 metres, transmission networks, telecommunication and IT networks (optical fiber), transformer substations and distribution substations in Zajączkowo, access roads to wind turbines (including service roads), assembly yards, and repair of commune roads. The equipment was delivered by VESTAS Dania. The total net value of the project was PLN 50 million.